The Un-insulated tanks are manufactured with WRAS approved materials. If however you require a FULL WRAS approved tank please see our one and two piece insulated tanks.;
Tank manufactured with WRAS approved materials.
Manufactured to meet BS7491 Parts 1 & 2, using the highest quality GRP materials, ensuring a long service life with minimal maintenance requirements.
Delivery generally 2 weeks.
Grey colour as standard (other RAL or BS colours are available at additional cost)
Only materials of the highest quality are used along with a highly efficient manufacturing processes. This combination ensures that these tanks are of the highest quality available.
All internal surfaces, including the lid, have an Isophthalic white gelcoat layer which provides a clinical smooth surface which will not support the growth of microbiological organisms. This gelcoat layer is reinforced by the main GRP laminate which provides the main structure of the tank body. The materials used are of the highest quality and applied with exacting production standards to assist in prevention of osmotic blistering. Further reinforcement is provided by square section steel tubing with fully welded corner joints. Steel reinforcement ensures that the softening and general deterioration encountered with timber supports is avoided, thus providing full structural reinforcement for the life of the tank.
After the steel reinforcement is fitted, the GRP outer skin is then applied. This ensures that the reinforcement is fully encapsulated and protected from external conditions.
Nominal capacity shown
Nominal capacity= full capacity to top of tank
Actual capacity =float level
To download product information click on the PDF icons below.
|
| Name |
Description |
Download PDF |
| Template |
Option |
 |